The scope associated with the Homewood Suites project included the following:
• Exterior Studs: 10,000 feet of metal
• Exterior Sheathing: 60,000 sqft
• Interior Studs: 4,000 lineal feet of partitions
• Drywall: 350,000 sqft
• Acoustical Ceilings: 20,000 sqft
• Carpentry:
• Doors/Frames/Hardware: 175 units
• Cabinets and Trimwork
The scope associated with the Town Center project included the following:
• Exterior Studs: 60,000 feet of metal
• Exterior Sheathing: 40,000 sqft
• 1,000 lineal feet of Demising Wall
TALLMADGE
Tallmadge High School - Tallmadge, OH
Completed: Winter 2008
The scope associated with the Akron SMT project includes the following:
• Exterior Studs: 60,000 feet of metal
• Interior Studs: 4,000 lineal feet of partitions
• Drywall: 120,000 sqft
• Acoustical Ceilings: 70,000 sqft